Wessex Water is to supply the new development of 2000 houses in
Poundbury with drinking water. It has been determined that a pumping
station (PS) at Burton will supply water from the regional main to a
service reservoir (SR) at Lambert’s Hill, which in turn will allow water
to flow by gravity to the urban development. There are therefore two
pipes that need to be designed, the pumped trunk main from Burton PS to
Lambert’s Hill SR, and the gravity distribution main from Lambert’s Hill
SR to Poundbury. You are tasked with examining the alternatives and
proposing the most cost effective solutions; your designs will encompass
the route, pipe material, pipe diameter and, for the trunk main, the
outline pump arrangement. You will also advise on the need for pressure
surge protection.
Hydraulics and Engineering Applications Report
Order 100% Plagiarism Free Paper Now
The pipeline’s route will be governed by a number of factors, amongst
them system hydraulics (ground elevation and slope), land use
(landowners, road / rail and river crossings), sensitive areas (AONB,
CWS, SSSI, SAM) and access (construction and maintenance). The
pipeline’s diameter will be governed by system hydraulics (pressure,
flow, friction, length) and the material will be governed by ground
conditions and costs. The pertinent requirements from the Wessex Water
Design Standards are given below (for more information please refer to
the full document on the module website):
1. General
• Trunk mains shall not be used to provide local supplies
2. Design capacity
• Trunk mains shall be sized for peak week or maximum day demand
• Distribution mains shall be sized for peak hour demand on maximum day
demand
3. Design velocities
• Both minimum and maximum velocities shall be considered
• The diameter / velocity shall be optimized for pumping mains by
calculating
60 year whole life cost
Hydraulics and Engineering Applications Report
Order 100% Plagiarism Free Paper Now
• Min velocity based on 12 hour retention time; max velocity < 2.0 m/s for
trunk mains and < 1.5 m/s for distribution mains
4. Hydraulic design
• Colebrook White (HR Wallingford look-up tables)
• Roughness values to allow for future deterioration
5. Min pressure
• 6m anywhere along pipe• Distribution mains must be >15m (design for 20m)
6. Max pressure
• Where pressures in the distribution system are in excess of 35m
consideration shall be given to the installation of PRVs (see section 18)
• Max pressure limited to 16 Bar in pumped trunk mains [e-mail from
Wessex Water]
7. Pipe pressure rating
• To account for hydraulic testing, surge and fatigue
8. Material
• DI or PE
9. Protection
• Soil survey is required
10. Jointing
• Assume costs cover industry standards (n/a)
11. Gradients
• Thrust blocks are required for steep gradients (assume n/a)
12. Crossings
• Major crossings (at railway lines, rivers and main roads) will require
twin
pipes with isolating valves to be laid
• Buried crossings preferred
Hydraulics and Engineering Applications Report
Order 100% Plagiarism Free Paper Now
13. Cover and clearance
• Cover to crown of 0.9m to 1.3m
• Minimum separation from other pipes / ducts / cables of 500mm
14. Swabbing chambers
• Every 2.5km or less
15. Thrust blocks
• Required on bends / branches where pipelines not continuous or pipe
material does not possess adequate tensile strength
16. Valves
• In-line valves every 2km or less
• Air valves at high points
17. Hydrants and washouts
• Washout valves at low points
18. PRVs
• Shall be installed as required
In evaluating the options, your report must:
• Use outline design to size appropriate pipes of appropriate materials
• Address the costs and relative benefits of each scheme
• Make a recommendation as to which scheme should be taken forward to
detailed
design
• Use performance curves to select pumps for Duty / Standby / Assist
operation